Everett
Completed Builders Discount Warehouse industrial development at Brendale, Queensland
Project Case Study · Industrial

BDW Warehouse, Brendale

Builders Discount Warehouse (BDW) – Owner-Operator Industrial Warehouse Development, Brendale QLD

This distribution warehouse in Brendale, Moreton Bay was developed to allow the landowner to transition from tenant to owner-operator.

Industrial Owner-Operator Traditional Construction Development Management
Asset

11,600 m²

Industrial warehouse with showroom and office

Location

Brendale, QLD

City of Moreton Bay

Procurement

AS 4000

Traditional construct-only contract

Delivery

End-to-end

Development and construction management

01 / The Project

Project Overview

Designed specifically around the operational requirements of the occupier, the facility avoided a speculative leasing model and instead prioritised functionality and efficiency. A traditional construction methodology was adopted, requiring detailed coordination between design intent, buildability, and construction outputs throughout the documentation and delivery phases.

To manage this complexity, EVERETT was engaged to structure and deliver a commercially viable development pathway, combining planning, authority negotiation, detailed design oversight, construction input and ancillary income initiatives.

02 / Understanding the Brief

The Client and the Why

The client was an established industrial occupier operating from leased premises. Rising rental risk, operational constraints, and long-term business growth objectives prompted the decision to pursue owner occupation through a purpose-built facility. While the site presented a strong strategic opportunity, it was subject to flood constraints, and infrastructure considerations that introduced planning, costs and delivery risk.

Given the bespoke nature of the warehouse and the use of traditional construction, early design and construction involvement was critical. EVERETT was engaged to manage these risks holistically and ensure the final building outcome aligned with the client’s operational needs.

Development Brief

Development Vision and Objectives

  • Enable smooth transition from tenant to owner-operator.
  • Deliver a purpose-built distribution warehouse tailored to operational workflows.
  • Maintain control over design and construction outputs using traditional procurement and building methods.
  • Achieve approval certainty on a flood affected site.
  • Improve feasibility through supplementary income streams.
  • Maintain flexibility for future asset optimisation.
03 / Delivering the Brief

What Was Important to the Client – and How EVERETT Responded

What was important to the Client and what did EVERETT do to address and solve the client requirements:

01

Reducing energy costs

Coordinated a 270kw rooftop solar system.

02

B-Double vehicle access

Coordinated B-Double swept path design and approvals.

03

Power & natural gas certainty

Led early authority applications and servicing strategies.

04

Additional rental income

Negotiated third-party signage lease and approvals.

05

Future flexibility

Future-proofed the facility for additional tenancies.

04 / Solving the Challenges

Key Constraints and How They Were Solved

CHALLENGE 01

Flood Constraints and Hydraulic Compliance

BDW Brendale site showing flood-related site conditions and development context

The site is impacted by flood overlays requiring detailed hydraulic modelling and a flood-responsive built form. EVERETT coordinated planners, flood engineers and designers to:

  • Optimise the developable and buildable area
  • Optimise the Gross Floor Area (GFA) & Net Lettable Area (NLA)
  • Establish an appropriate finished floor level strategy
  • Incorporate suspended building elements where required
  • Demonstrate no worsening of flood behaviour on surrounding land
  • Align Council expectations with practical, buildable outcomes suitable for traditional construction
CHALLENGE 02

Purpose Built and Traditional Construction Requirements

As a purpose built, owner occupied distribution facility, the warehouse design required close alignment between architectural layout, structural systems, loading areas, and operational flow. The traditional construction approach increased the importance of early resolution of details affecting cost, program, and performance.

EVERETT identified that an AS 4000 construction contract was the ideal procurement solution for the project with EVERETT acting as Principal’s Representative and Superintendent under the building contract.

Design and documentation priorities

EVERETT maintained heavy involvement in the design development and documentation process to ensure:

  • Operational requirements were embedded in the building form
  • Design compliance did not compromise functionality or efficiency
  • Buildability issues were addressed prior to construction
  • Construction outcomes reflected the original operational intent
CHALLENGE 03

Commercial Feasibility and Income Support

To strengthen feasibility and reduce holding risk, EVERETT negotiated a 15 year advertising signage lease with AOS signs, creating an additional passive income stream for the landowner. This long-term lease materially improved project certainty and offset development and ownership costs.

In addition, the project incorporated the installation of a 270kw rooftop solar system, materially reducing operational energy costs for the owner-operator. Integrating on-site renewable energy further enhanced long-term operating efficiency and strengthened the overall commercial performance of the asset.

CHALLENGE 04

Authority Negotiation and Risk Management

EVERETT led direct engagement with Council officers, QFES, TMR and infrastructure authorities to resolve flood, access and servicing considerations early, reducing approval risk and avoiding costly late-stage redesign that can disproportionately impact traditionally constructed facilities.

CHALLENGE 05

Power and Natural Gas Supply

The facility and operations required a power and natural gas upgrade. EVERETT negotiated power upgrades for the site with Energex, resulting in a free PMT for the client. EVERETT negotiated a high-pressure natural gas upgrade for the site, resulting in a free gas supply for the client.

05 / Our Involvement

Role Performed

EVERETT provided complete end-to-end Development Management, Project Management, Principal’s Representative and Superintendent services, acting as the sole point of accountability for the owner-operator. The developer, landlord and tenant maintained a hands-off role, with assurance that EVERETT independently managed approvals, commercial structuring and delivery. This project was delivered for a repeat client.

01 / Strategy

Development Strategy & Commercial Structuring

  • Feasibility study and commercial strategy development aligned to an owner-operator model
  • Structuring of a commercially viable development pathway to secure long-term operational control
  • Finance application coordination for both landlord and tenant
  • Securing and negotiating a third-party tenant for an external advertising pylon, including a 15-year lease to establish additional long-term income
02 / Approvals

Planning, Approvals & Authority Management

  • Pre-lodgement meetings and ongoing authority engagement
  • Development Application (DA) strategy, coordination and approval management
  • Authority applications and regulatory approvals across all disciplines
  • Building Approval procurement and coordination
03 / Delivery

Design, Procurement & Construction Delivery

  • Design management and coordination during traditional construction documentation
  • Leadership and coordination of the full consultant team (planning, civil, flood, traffic, architecture, interior design)
  • Management of traditional build contract structures covering base build and tenant fit-out
  • Project Management, Principal’s Representative and Superintendent services during construction, maintaining seamless coordination between landowner, tenant and contractor
06 / Operational Readiness

Tenant & Operational Coordination

Co-ordination of the tenant’s fit-out and operational commencement requirements, including liaison with specialist suppliers across:

Warehouse interior showing racking and storage systems at BDW Brendale
Warehousing & Logistics Systems
  • Racking systems
  • Pallet wrapping equipment
  • Forklifts and material handling equipment
Building Services & Technology
  • EV charging infrastructure
  • Audio-visual (AV) systems
  • CCTV and security systems
Energy & Sustainability
  • Solar PV systems integration
Branding & Operations
  • Tenant signage and wayfinding

This coordination ensured all tenant systems, equipment and services were aligned with the construction programme and operational start-up requirements.

07 / The Result

Outcomes and Client Benefits

The completed development supports the client's transition from tenant to owner-operator, with the facility designed around operational needs and long-term commercial performance.

01Successful transition from tenant to owner-operator
02Reduced long-term operational and rental risk
03Purpose-built warehouse aligned to operational workflows
04Clear, defensible flood approval strategy
05Improved feasibility via long-term signage income
06Confidence that construction reflected design and operational intent
08 / Expert Insight

Experience in Action

“Owner operator projects using traditional construction demand close control of both design and delivery. At BDW Brendale, integrating flood responsive design with a purpose built operational brief and supplementing income through signage lease, allowed the client to secure certainty on both performance and cash flow”

Dan Everett, Director – EVERETT Property Development Management

09 / Project Details

Project Summary

Project details and key areas of EVERETT's involvement.

ProjectBuilders Discount Warehouse (BDW), Brendale QLD
Location300 South Pine Road, Brendale (City of Moreton Bay)
Asset Type11,600 m² owner-operator industrial warehouse with showroom and office
ClientBuilders Discount Warehouse
DA ArchitectDA Plan
Town PlannerConsult Planning
Construction ContractAS4000 (Traditional – Construct only)
EVERETT ServicesDevelopment Management
Principal’s Representative
Project Management
Superintendent (Construction Contract Administration)
Key Involvement Highlights
  • Development Application (DA), authority approvals and Building Approval management
  • Traditional construction procurement covering base build and tenant fit-out under AS 4000
  • Design and construction phase coordination for owner-operator delivery
  • Negotiation and delivery of a 15-year third-party advertising lease (AOS), strengthening long-term asset income
More About Our Involvement

Development Management Through to Delivery

From planning and commercial strategy through to construction and completion, EVERETT provides hands-on support across the development process.

Development Management

Coordinating the development journey, from strategy and approvals through to delivery.

Explore Development Management

Project Management

Managing project coordination, programme, consultants and construction delivery.

Explore Project Management

Superintendent Services

Independent contract administration and superintendent services during construction.

Explore Superintendent Services
Planning an Industrial Development?

Considering an Owner Operator Industrial Project?

If you are an industrial business considering the transition from tenant to owner operator, or planning a purpose built facility in Queensland, contact EVERETT for a confidential discussion on structuring a compliant and commercially sustainable pathway.

Contact EVERETT

EVERETT Property Development Management

Call: 07 3264 5572

Explore Our Projects